Basically, as above. I've been referred to the Brompton by my Consultant with a view to possible Lung Volume Reduction. This was around mid May and I've yet to hear anything. I have tried to call the Brompton but it just rings out. I've completed a Pulmonary Rehab course, so there wouldn't be a delay due to that.
I was wondering if anybody had any dealings with the Brompton who may be able to advise if this is a normal waiting period or rather excessive.
Thanks