Most of the lesions show no increased activity.
PSA before treatment was : 14.45
Treatment has already been done for the following two lesions.
Completion date is 02/23/24
1x0.7 cm active lesion is noted involving the body of T5.
1.5 x 1. cm active lesion is noted involving the left side of the body of L5. Ametabolically active lesion is seen involving the left
transverse process of L5
Break because of Insurance reasons + side effects
(02/23/24 to 03/20/24)
Three remain, and treatment will start on 03/20/24. Based on the current schedule, we plan to complete them before 31 March.
2.8 x 16. cm lesion is involving the posterior left iliac crests is seen.
3.2 x 1.6 cm lesion is seen involving the right side of the sacrum.
5.8 x 3 cm lesion is noted involving the left sacrum.
Questions
Should I do PSA on 03/20 before the next session?
Should I wait to complete all sessions and than do PSA ?